Year of Completion: | 30-06-09 |
Employer: | Bangladesh Water Development Board |
Location: | Chapai Nawabganj |
Contact Value: | BDT. 26.76 Million, US$. 0.39 Million |
Bank Revetment work along the left bank of River Padma at Mirerchara from Meterage M(+)1362.00 to Meterage M (+)1712.00 in connection with “Protection of ChapaNawabganj Sadar and Shibganj upazila from the erosion of the Padma River” Project under Nawabganj O&M Division, BWDB, Chapai Nawabganj during 2008-09