Year of Completion: | 04.11.2012 |
Employer: | Local Govt. Engineering Department (LGED) |
Location: | Gaforgaon, Mymensingh |
Contact Value: | BDT 727.22 million , US$ 10.31 million |
Construction of 810m Long PC Box Girder Bridge on Saltia Bazar-Hazigonj Bazar-Dewangonj Bazar Road over the old Brahmmaputra River at Gaforgaon Upazila, District-Mymensingh. The work consists of construction of 810m long pre-stressed Concrete Box Girder Bridge over the old Brahmmaputra River at Gaforgaon having deep cast-in-situ piling work of 204 Nos. pile of 1250mm dia meter and length of each pile 50m and 56 Nos. pile of 700mm dia meter and length of each pile 40m respectively.